Live Update

Phase 01 of 09Planning

We're deep in blueprints and material selections right now. It's a lot of decisions — and we're making every one of them count.

Last updated July 3, 2026

01

Planning

In Progress

Started July 2026

Architectural drawings in final review
Primary suite layout being refined
Material selections 80% complete
Builder kickoff meeting scheduled

Where it all begins.

We're sitting at the table right now, and honestly it's a mix of excitement and information overload. There are floor plan revisions spread across the counter, material samples stacked in the corner, and about a hundred browser tabs open. This is the phase where every decision feels huge — because it is. The choices we make here will show up in every room of this home for decades. We're not rushing a single one.

Latest update

Currently finalizing the architectural drawings and locking in our material selections. The floor plan is almost exactly where we want it — just a few tweaks to the primary suite layout.

Architectural plans and blueprints spread on a drafting table
Live Phase
02

Permits

Coming Soon

Coming Soon

Building permit application
Site plan approval
Utility connections approval
Final sign-off before breaking ground

Getting everything approved the right way.

Once the plans are locked, we'll submit everything to the county for permitting. It's not the most exciting phase to talk about, but it's one of the most important. We're doing this by the book — every permit, every inspection, every sign-off. When this home is done, there won't be a single question mark hanging over it.

Status

Not started yet — we'll update this section the moment permits are submitted.

Photos will appear here when this phase begins
03

Foundation

Coming Soon

Coming Soon

Site clearing and grading
Excavation
Footings poured
Slab completed

The day we break ground.

We've been looking forward to this one. The day the excavator shows up and the first dirt gets moved — that's when it stops being a dream on paper and starts being a real thing in the ground. We'll be out there with a camera, and you'll see every bit of it.

Status

Not started yet — follow along and we'll share photos the day it begins.

Photos will appear here when this phase begins
04

Framing

Coming Soon

Coming Soon

Floor system installed
Exterior walls framed
Interior walls framed
Roof trusses set

Walls go up — and it gets real.

Framing is the phase that makes people cry. We're not even joking. You walk onto the lot and suddenly there are walls, there are rooms, there's a staircase going up to a second floor that didn't exist yesterday. We cannot wait to share this one with you.

Status

Not started yet — this update will include a full photo walkthrough of the framed home.

Photos will appear here when this phase begins
05

Roofing

Coming Soon

Coming Soon

Roof sheathing installed
Underlayment applied
Roofing material installed
Gutters and flashing completed

The home gets its roof.

Once the roof goes on, the whole feel of the build changes. It's no longer a skeleton — it's a structure. The home is protected, interior work can begin in earnest, and you start to see the silhouette of what this place is going to look like from the street.

Status

Not started yet — check back for updates and photos when roofing begins.

Photos will appear here when this phase begins
06

Mechanical & Electrical

Coming Soon

Coming Soon

HVAC rough-in
Plumbing rough-in
Electrical rough-in
Rough inspections passed

The stuff behind the walls that makes it all work.

Most homebuyers never see this phase — they just inherit whatever's in the walls. We think that's a shame, because this is where you can really tell the difference between a home built right and one that wasn't. We'll walk you through all of it. No shortcuts, and we'll prove it.

Status

Not started yet — we'll document this phase in detail when it begins.

Photos will appear here when this phase begins
07

Interior Finishes

Coming Soon

Coming Soon

Insulation and drywall
Hardwood flooring installed
Custom cabinetry installed
Countertops, tile, and fixtures set

This is the part we've been dreaming about.

Hardwood floors going down. Marble counters being set. Custom cabinets getting hung. Every finish we agonized over in the planning phase starts showing up in real life. We'll share every reveal as it happens.

Status

Not started yet — this will be our most photo-heavy update of the entire build.

Photos will appear here when this phase begins
08

Landscaping

Coming Soon

Coming Soon

Driveway and walkways poured
Grading and drainage finalized
Sod and plantings installed
Outdoor living spaces completed

The outside gets its moment.

A beautiful home deserves a beautiful approach. We're putting real thought into the landscaping — not just throwing down sod and calling it done. The driveway, the plantings, the outdoor spaces — all of it designed to feel like it belongs.

Status

Not started yet — exterior and landscaping updates coming in a future post.

Photos will appear here when this phase begins
09

Move-In Ready

Coming Soon

Coming Soon

Final inspections completed
Punch list finished
Certificate of occupancy issued
Keys handed over

The moment we've all been working toward.

The final walkthrough. The punch list. The keys. If you've been following along since the planning phase, this moment is going to mean something to you too. You'll know this home. You'll have watched it get built.

Status

Not started yet — but we'll make sure this final update is worth the wait.

Photos will appear here when this phase begins

Stay in the loop

Don't miss a single update.

We post every time a phase wraps up. Leave your email and we'll send it straight to you — no hunting around, no wondering if something happened.

We'll only reach out when something real happens. Promise.

Coming Soon · Phase 1 of 9 Underway
Inquire about this home
1336 Becket Dr

A custom new construction home being built from the ground up in Atlanta, GA. Follow every step of the journey — from blueprints to move-in day.

1336 Becket Dr, Atlanta, GA 30319

The Property

5,520 sq ft

Total heated area

6 Bedrooms

Including guest suite

3 Floors

Basement + 2 above grade

Atlanta, GA

30319

© 2026 1336 Becket Dr. All rights reserved.

Custom New Construction · Atlanta, GA